Project details

Project:

Ecoparc 3 – Skimmer System

Process area:

Digestion

Charging material:

• Recycling and waste treatment plant

Ecoparc 3 in Barcelona processes the residual fraction, i.e. waste that has not been collected separately and may still contain around 30% to 40% organic matter.

Biological treatment:

The organic matter obtained in the sorting process is first subjected to pre-treatment. The resulting suspension then passes through a sand trap and hydrocyclones to remove any remaining impurities – both heavy and floating.

In the next step, the material is fed into two fermenters in which the organic matter is fermented.

This process produces a methane-rich biogas and a fermentation residue.

FINSTERWALDER work packages

  • Design Support
  • Turnkey delivery
  • Assembly
  • Commissioning

FINSTERWALDER machines used

Yahr 2026

FINSTERWALDER Environmental Technology

 

Project planning, waste consulting service, customized solutions

We are professionals and can help you!

Based on detailed raw material data, we design customized solutions to meet your needs. Modernization of existing systems is just one of our strengths!

Project planning, waste consulting, individual solutions

We are professionals and can help you!

Based on detailed raw material data, we design customized solutions to meet your needs. Modernization of existing systems is just one of our strengths!

Similar projects

Our technology offers individual solutions for all process areas in the field of biogas and anaerobic digestion of organic waste. We support our customers from the initial idea through to planning, implementation, commissioning and ongoing operation. Similar projects of our worldwide customers can be found here!

  • Digestion, Pasteurization, Pre-Treatment, Pumps

    Langage Farm AD (UK) – Equipment for substrate cleaning

    Charging material:

    • 18,000 t/a
    • Kitchen waste from the catering trade

  • Digestion, Pasteurization, Pre-Treatment, Pumps, Top

    Rothmühle (DE) – Biogas plant

    Charging material:

    • 25,000 t/a
    • Municipal garden waste
    • Organic waste and commercial kitchen waste

    Ansicht Nassvergärungsanlage Rothmühle, AES GmbH
  • Digestion, Pumps

    Little Island, Cork (IE) – Sediment removal and skimmer system

    Charging material:

    • 90.000 t/y
    • domestic andcommercial food waste

    Placeholder Projects
  • Case Studies

    EcoCenter Lana (IT) – Revision of hydrolysis

    Charging material:

    • 32,000 t/a
    • Municipal organic waste and food waste

    Lana EcoCenter, Revision der Hydrolyse
  • Biology, Digestion, Pre-Treatment

    Jiangjin (CN) – Treatment plant and fermentation

    Charging material:

    • 75,000 t/a
    • Contaminated kitchen waste