Project details
Project:
Little Island, Cork (IE) – Sediment removal and skimmer system
Process area:
Digestion, Pumps
Charging material:
• 90.000 t/y
• domestic andcommercial food waste
Little Island, Cork, ist der Standort einer derzeit im Bau befindlichen hochmodernen Biomethananlage. Nach der Fertigstellung wird sie die größte Anlage ihrer Art in Irland sein und einen bedeutenden Beitrag zu Umwelt- und Wirtschaftszielen auf regionaler und nationaler Ebene leisten.
The facility is designed to process organic household and commercial waste and will convert approximately 90,000 tons of waste into around 81 GWh of biomethane annually. In addition to energy production, the facility will produce high-quality biofertilizers and food-grade CO₂ for industrial applications.
Construction began in early 2025, and the facility is scheduled to open at the end of 2027.
FINSTERWALDER work packages
- Design Support
- Turnkey delivery
- Assembly
- Commissioning
FINSTERWALDER machines used
- Ball valve pump KV20
- Hydraulic power pack 30 kW for KV20
- Floor scraper
- Sediment separator
- Skimmer
Yahr 2026
FINSTERWALDER Environmental Technology
Similar projects
Our technology offers individual solutions for all process areas in the field of biogas and anaerobic digestion of organic waste. We support our customers from the initial idea through to planning, implementation, commissioning and ongoing operation. Similar projects of our worldwide customers can be found here!
Digestion
Ovobrand (AR) – system for sediment separation
Charging material:
• 120 t/d
• Chicken litte
Biology
Moosburg – Sewage treatment plant (DE)
Charging material:
• 75 m³/d Centrate from sewage sludge
• Leftovers
Pre-Treatment, Pumps
Davidson Environmental (CA) – Compact treatment
Charging material:
• 12,000 t/a
• Commercial kitchen waste
Digestion, Pasteurization, Pre-Treatment, Pumps
Langage Farm AD (UK) – Equipment for substrate cleaning
Charging material:
• 18,000 t/a
• Kitchen waste from the catering trade
Digestion, Pumps
Little Island, Cork (IE) – Sediment removal and skimmer system
Charging material:
• 90.000 t/y
• domestic andcommercial food waste