From Stefanie Kuss
On 6. September 2023
Category: News
The next step in our project at Entsorgungsbetriebe Lübeck: installation and assembly of the 45 m² container. Part of the factory roof was temporarily removed for this purpose. The container was brought in through the roof opening and secured. Many thanks to everyone for the excellent cooperation! It can go on like this!