Project details

Project:

Xian (CN) – Digestion plant for organic waste

Process area:

Digestion, Pre-Treatment, Pumps

Charging material:

• 400 t/d
• Food waste and municipal biowaste

FINSTERWALDER work packages

  • Machine delivery
  • Design Support
  • Commissioning support

FINSTERWALDER machines used

  • Separation press BS20
  • Gate valve pump KS23
  • Hydraulic unit for KS23
  • Lightweight skimmer
  • Floor scraper

Year 2023

FITEC China

Project planning, waste consulting service, customized solutions

We are professionals and can help you!

Based on detailed raw material data, we design customized solutions to meet your needs. Modernization of existing systems is just one of our strengths!

Project planning, waste consulting, individual solutions

We are professionals and can help you!

Based on detailed raw material data, we design customized solutions to meet your needs. Modernization of existing systems is just one of our strengths!

Similar projects

Our technology offers individual solutions for all process areas in the field of biogas and anaerobic digestion of organic waste. We support our customers from the initial idea through to planning, implementation, commissioning and ongoing operation. Similar projects of our worldwide customers can be found here!

  • Case Studies

    Composting plant Anröchte – Pumping technology

    Charging material:

    - unknown

    Kompostwerk Anröchte, Schieberpumpe KS23
  • Pumps

    Anröchte (DE) – Pump system with high solids content

    Charging material:

    • Digestate from dry fermentation

  • Langage Farm AD – Biogas plant (United Kingdom)

    Charging material:

    • 18,000 tons/year of kitchen waste
    • Fertilize

  • Biology

    Moosburg – Sewage treatment plant (DE)

    Charging material:

    • 75 m³/d Centrate from sewage sludge
    • Leftovers

  • Digestion, Pre-Treatment

    Buchholz biogas plant (LU – treatment plant

    Charging material:

    • 7,550 t/a
    • agricultural substrates
    • Food waste and organic waste