Project details
Project:
Villa Avocado (MX) – Biogas plant
Process area:
Biology, Pasteurization, Pumps
Charging material:
• 43,000 t/d
• Organic waste from avocado oil production process
FINSTERWALDER work packages
- Design LPH 1-3 according to HOAI
FINSTERWALDER machines used
- Ball valve pump KV20
- Double-tube heat exchanger
- Bicarbonate analyzer
Year 2023
FITEC North America
Similar projects
Our technology offers individual solutions for all process areas in the field of biogas and anaerobic digestion of organic waste. We support our customers from the initial idea through to planning, implementation, commissioning and ongoing operation. Similar projects of our worldwide customers can be found here!
Biology
Moosburg – Sewage treatment plant (DE)
Charging material:
• 75 m³/d Centrate from sewage sludge
• Leftovers
Case Studies
EcoCenter Lana (IT) – Revision of hydrolysis
Charging material:
• 32,000 t/a
• Municipal organic waste and food waste
Pumps
Anröchte (DE) – Pump system with high solids content
Charging material:
• Digestate from dry fermentation