Project details
Project:
Little Island, Cork (IE) – Sediment removal and skimmer system
Process area:
Digestion, Pumps
Charging material:
• 90.000 t/y
• domestic andcommercial food waste
Little Island, Cork, ist der Standort einer derzeit im Bau befindlichen hochmodernen Biomethananlage. Nach der Fertigstellung wird sie die größte Anlage ihrer Art in Irland sein und einen bedeutenden Beitrag zu Umwelt- und Wirtschaftszielen auf regionaler und nationaler Ebene leisten.
The facility is designed to process organic household and commercial waste and will convert approximately 90,000 tons of waste into around 81 GWh of biomethane annually. In addition to energy production, the facility will produce high-quality biofertilizers and food-grade CO₂ for industrial applications.
Construction began in early 2025, and the facility is scheduled to open at the end of 2027.
FINSTERWALDER work packages
- Design Support
- Turnkey delivery
- Assembly
- Commissioning
FINSTERWALDER machines used
- Ball valve pump KV20
- Hydraulic power pack 30 kW for KV20
- Floor scraper
- Sediment separator
- Skimmer
Yahr 2026
FINSTERWALDER Environmental Technology
Similar projects
Our technology offers individual solutions for all process areas in the field of biogas and anaerobic digestion of organic waste. We support our customers from the initial idea through to planning, implementation, commissioning and ongoing operation. Similar projects of our worldwide customers can be found here!
Biology, Digestion, Pasteurization
Bayview Biogas (CA) – Hygienization and discharge system
Charging material:
• 6,000 t/a
• Grape marc and food waste
Digestion, Pre-Treatment, Pumps
Xian (CN) – Digestion plant for organic waste
Charging material:
• 400 t/d
• Food waste and municipal biowaste
Biology, Digestion, Pasteurization, Pre-Treatment, Pumps
EcoCenter Lana (IT) – Biogas plant
Charging material:
• 32,000 t/a
• Municipal organic waste and food waste