Project:
Jiangjin (CN) – Treatment plant and fermentation
Process area:
Biology, Digestion, Pre-Treatment
Charging material:
• 75,000 t/a
• Contaminated kitchen waste
FINSTERWALDER work packages
- Preliminary draft
- Engineering services
- Machine delivery
- PLC programming
- Commissioning
- LPH 1-3 according to HOAI
FINSTERWALDER machines used
- Separation press BS20
- Floor scraper
- Skimmer
- Bicarbonate analyzer
Year 2016
FITEC China
Similar projects
Our technology offers individual solutions for all process areas in the field of biogas and anaerobic digestion of organic waste. We support our customers from the initial idea through to planning, implementation, commissioning and ongoing operation. Similar projects of our worldwide customers can be found here!
Digestion, Pasteurization, Pre-Treatment, Pumps
BAVA Garmisch-Partenkirchen (DE) – Biogas plant
Charging material:
• 10,000 t/a
• Municipal organic waste and food waste
Case Studies
Biowaste treatment Asdokshof – Pumptechnology
Charging material:
- unknown

Pasteurization, Pre-Treatment, Pumps, Top
Entsorgungsbetriebe Lübeck (DE) – Processing of food waste
Charging material:
• 5,000 t/a
• Food waste and municipal biowaste
Biology
Moosburg – Sewage treatment plant (DE)
Charging material:
• 75 m³/d Centrate from sewage sludge
• Leftovers
Biology, Case Studies, Digestion, Pasteurization, Pre-Treatment, Pumps
Biopower Bernau (DE) – The own biogas plant, test plant
Charging material:
• 6,000 t/a
• Commercial food waste
• Municipal waste