Project details

Project:

Ecoparc 3 – Skimmer System

Process area:

Digestion

Charging material:

• Recycling and waste treatment plant

Ecoparc 3 in Barcelona processes the residual fraction, i.e. waste that has not been collected separately and may still contain around 30% to 40% organic matter.

Biological treatment:

The organic matter obtained in the sorting process is first subjected to pre-treatment. The resulting suspension then passes through a sand trap and hydrocyclones to remove any remaining impurities – both heavy and floating.

In the next step, the material is fed into two fermenters in which the organic matter is fermented.

This process produces a methane-rich biogas and a fermentation residue.

FINSTERWALDER work packages

  • Design Support
  • Turnkey delivery
  • Assembly
  • Commissioning

FINSTERWALDER machines used

Yahr 2026

FINSTERWALDER Environmental Technology

 

Project planning, waste consulting service, customized solutions

We are professionals and can help you!

Based on detailed raw material data, we design customized solutions to meet your needs. Modernization of existing systems is just one of our strengths!

Project planning, waste consulting, individual solutions

We are professionals and can help you!

Based on detailed raw material data, we design customized solutions to meet your needs. Modernization of existing systems is just one of our strengths!

Similar projects

Our technology offers individual solutions for all process areas in the field of biogas and anaerobic digestion of organic waste. We support our customers from the initial idea through to planning, implementation, commissioning and ongoing operation. Similar projects of our worldwide customers can be found here!

  • Case Studies, Pumps

    Biowaste treatment Asdokshof – Pumptechnology

    Charging material:

    • 5,000 t/a

    Schieberpumpe KS32 Asdonkshof
  • Biology, Pasteurization, Pumps

    Villa Avocado (MX) – Biogas plant

    Charging material:

    • 43,000 t/d
    • Organic waste from avocado oil production process

  • Digestion

    Ovobrand (AR) – system for sediment separation

    Charging material:

    • 120 t/d
    • Chicken litte

    Sedimentaustrag aus Vorlage-Behälter
  • Digestion, Pasteurization, Pumps

    Toronto ZooShare (CA) – Biogas plant

    Charging material:

    • 12,000 t/a
    • Commercial and municipal food waste

  • Digestion

    Ovobrand (AR) – system for sediment separation

    Charging material:

    • 120 t/d
    • Chicken litte

    Sedimentaustrag aus Vorlage-Behälter