Project details

Project:

Composting plant Anröchte – Pumping technology

Process area:

Case Studies

Charging material:

unknown

Pumping technology Anröchte composting plant

Brief description of the project

Entsorgungswirtschaft Soest GmbH collects and recycles approx. 30,000 t/a of organic waste at the Anröchte composting plant. The existing composting plant was expanded in 2020 to include digestion. The tender was won by Hitachi Zosen INOVA AG for the digestion part. Finsterwalder Umwelttechnik in turn was allowed to supply and install the pump technology for circulation and transfer of the digestion product from the digester to the composting system. The pump capacity is adjustable between 12 and 22m³/h at 10bar delivery pressure.

Integrated FINSTERWALDER technology

  • 2x gate valve pump KS23 – DN250
  • 1 x hydraulic unit 2 x 15kW
  • 1 x control unit

Services

  • Delivery
  • Construction
  • Assembly
  • Commissioning
  • Maintenance

Waste treatment processes

Plant diagram of pumping technology for digestate at the Anröchte composting plant

Procedure in detail

Gate valve pump KS23

FINSTERWALDER SLIDER PUMP KS23 DN250
The two KS23 slide gate pumps are filled alternately from a DN400 pipe via a Y-piece.
One pump pushes the fermentation product back into the fermenter via a DN250 pipe. Both pumps
are operated simultaneously to continuously transfer the fermentation product into the compost mixer.
HYDRAULIC UNIT
The hydraulic unit specially developed for this project drives both pumps and can also operate
other valves on the system. It has a 600L oil tank, a WHG oil pan and consists
of three oil circuits.
control cabinet
CONTROL CABINET AND AUTOMATION
The control cabinet and automation were adapted for the project. The aim was to ensure 24-hour automatic operation
and remote access. In addition, the fermentation product should be sent to the
compost mixer as continuously as possible. For this purpose, frequency inverters were installed, which allow both pumps to be operated
in a coordinated manner.

Project planning, waste consulting, individual solutions

We are professionals and can help you!

Based on detailed raw material data, we design customized solutions to meet your needs. Modernization of existing systems is just one of our strengths!

Project planning, waste consulting, individual solutions

We are professionals and can help you!

Based on detailed raw material data, we design customized solutions to meet your needs. Modernization of existing systems is just one of our strengths!

Similar projects

Our technology offers individual solutions for all process areas in the field of biogas and anaerobic digestion of organic waste. We support our customers from the initial idea through to planning, implementation, commissioning and ongoing operation. Similar projects of our worldwide customers can be found here!

  • Digestion, Pasteurization, Pumps

    Toronto ZooShare (CA) – Biogas plant

    Charging material:

    • 12,000 t/a
    • Commercial and municipal food waste

  • Pasteurization, Pre-Treatment, Pumps, Top

    Entsorgungsbetriebe Lübeck (DE) – Processing of food waste

    Charging material:

    • 5,000 t/a
    • Food waste and municipal biowaste

  • Digestion

    KBA Hard (CH) – Sediment discharge system

    Charging material:

    • Leftovers

  • Digestion, Pre-Treatment, Pumps

    Xian (CN) – Digestion plant for organic waste

    Charging material:

    • 400 t/d
    • Food waste and municipal biowaste

  • Biology, Digestion, Pasteurization, Pre-Treatment, Pumps

    EcoCenter Lana (IT) – Biogas plant

    Charging material:

    • 32,000 t/a
    • Municipal organic waste and food waste