Project details

Project:

Buchholz biogas plant (LU – treatment plant

Process area:

Digestion, Pre-Treatment

Charging material:

• 7,550 t/a
• agricultural substrates
• Food waste and organic waste

FINSTERWALDER work packages

  • Preliminary draft
  • Process diagram & construction
  • Machine delivery
  • Installation
  • PLC programming
  • Commissioning

FINSTERWALDER machines used

  • Separation press BS20
  • Floor scraper
  • Sediment separator
  • Skimmer

Year 2011

FINSTERWALDER Environmental Technology

Project planning, waste consulting service, customized solutions

We are professionals and can help you!

Based on detailed raw material data, we design customized solutions to meet your needs. Modernization of existing systems is just one of our strengths!

Project planning, waste consulting, individual solutions

We are professionals and can help you!

Based on detailed raw material data, we design customized solutions to meet your needs. Modernization of existing systems is just one of our strengths!

Similar projects

Our technology offers individual solutions for all process areas in the field of biogas and anaerobic digestion of organic waste. We support our customers from the initial idea through to planning, implementation, commissioning and ongoing operation. Similar projects of our worldwide customers can be found here!

  • Pumps

    Anröchte (DE) – Pump system with high solids content

    Charging material:

    • Digestate from dry fermentation

  • Case Studies

    Rothmühle AES GmbH (DE) – Planning of wet fermentation plant

    Charging material:

    • 32,000 t/a
    • Municipal organic waste and food waste

  • Digestion, Pre-Treatment, Pumps

    Yongjia (CN) – Food waste digestion plant

    Charging material:

    • 36,500 t/a
    • Commercial kitchen waste from the catering industry

  • Biology, Case Studies, Digestion, Pasteurization, Pre-Treatment, Pumps

    Biopower Bernau (DE) – The own biogas plant, test plant

    Charging material:

    • 6,000 t/a
    • Commercial food waste
    • Municipal waste

  • Case Studies

    EcoCenter Lana (IT) – Revision of hydrolysis

    Charging material:

    • 32,000 t/a
    • Municipal organic waste and food waste

    Lana EcoCenter, Revision der Hydrolyse