Our products in the “Pumps” range
Products
Products
in the “Pumps” process area
in the “Pumps” process area
The pumps we have developed meet the high requirements of the biogas process and can therefore be used in many other industrial areas. Talk to our experts.
Our projects in the “Pumps” area
Projects
Projects
in the “Pumps” process area
in the “Pumps” process area
Numerous reference projects demonstrate the high performance of the FINSTERWALDER process and components.
Pasteurization, Pre-Treatment, Pumps, Top
Entsorgungsbetriebe Lübeck (DE) – Processing of food waste
Charging material:
• 5,000 t/a
• Food waste and municipal biowasteDigestion, Pre-Treatment, Pumps
Xian (CN) – Digestion plant for organic waste
Charging material:
• 400 t/d
• Food waste and municipal biowasteBiology, Pasteurization, Pumps
Villa Avocado (MX) – Biogas plant
Charging material:
• 43,000 t/d
• Organic waste from avocado oil production processDigestion, Pre-Treatment, Pumps
Urumqi (CN) – Biogas plant for organic waste
Charging material:
• 109,500 t/a
Digestion, Pasteurization, Pre-Treatment, Pumps
Bioenergie Kaiserwinkel (AT) – Biogas plant
Charging material:
• 5,000 t/a
• Leftovers from the catering trade
• Municipal waste
Pasteurization, Pre-Treatment, Pumps, Top
Entsorgungsbetriebe Lübeck (DE) – Processing of food waste
Charging material:
• 5,000 t/a
• Food waste and municipal biowasteDigestion, Pre-Treatment, Pumps
Xian (CN) – Digestion plant for organic waste
Charging material:
• 400 t/d
• Food waste and municipal biowasteBiology, Pasteurization, Pumps
Villa Avocado (MX) – Biogas plant
Charging material:
• 43,000 t/d
• Organic waste from avocado oil production processDigestion, Pre-Treatment, Pumps
Urumqi (CN) – Biogas plant for organic waste
Charging material:
• 109,500 t/a