Our products in the “Pre-Treatment” area
Products
Products
in the “Pre-Treatment” process area
in the “Pre-Treatment” process area
Efficient preparation of the material is of the utmost importance for the entire process. The following products are used here. Please contact us directly for your individual requirements.
Our projects in the “Pre-Treatment” area
Projects
Projects
in the “Pre-Treatment” process area
in the “Pre-Treatment” process area
Numerous reference projects demonstrate the high performance of the FINSTERWALDER process and components.
Pasteurization, Pre-Treatment, Pumps, Top
Entsorgungsbetriebe Lübeck (DE) – Processing of food waste
Charging material:
• 5,000 t/a
• Food waste and municipal biowasteDigestion, Pre-Treatment, Pumps
Xian (CN) – Digestion plant for organic waste
Charging material:
• 400 t/d
• Food waste and municipal biowasteDigestion, Pre-Treatment, Pumps
Urumqi (CN) – Biogas plant for organic waste
Charging material:
• 109,500 t/a
Digestion, Pasteurization, Pre-Treatment, Pumps
Bioenergie Kaiserwinkel (AT) – Biogas plant
Charging material:
• 5,000 t/a
• Leftovers from the catering trade
• Municipal wasteDigestion, Pre-Treatment, Pumps
Yongjia (CN) – Food waste digestion plant
Charging material:
• 36,500 t/a
• Commercial kitchen waste from the catering industry
Pasteurization, Pre-Treatment, Pumps, Top
Entsorgungsbetriebe Lübeck (DE) – Processing of food waste
Charging material:
• 5,000 t/a
• Food waste and municipal biowasteDigestion, Pre-Treatment, Pumps
Xian (CN) – Digestion plant for organic waste
Charging material:
• 400 t/d
• Food waste and municipal biowasteDigestion, Pre-Treatment, Pumps
Urumqi (CN) – Biogas plant for organic waste
Charging material:
• 109,500 t/a
Digestion, Pasteurization, Pre-Treatment, Pumps
Bioenergie Kaiserwinkel (AT) – Biogas plant
Charging material:
• 5,000 t/a
• Leftovers from the catering trade
• Municipal waste